Access/Egress Control System Install/Demo:

Access/Egress control Systems and plans shall be per NFPA 101, NFPA 70, and NFPA 72, as amended by the State of Georgia with applicable 120-3-3.

Required documents listed below for new installs:

  • Submit your current low voltage license issued by the state of GA.
  • Installation drawings (to include wire diagrams and correct symbols)
  • Product submittal

Required documents listed below for alterations/repairs/modifications of existing systems:

  • Submit your current low voltage license issued by the state of GA.
  • Floor plan to show what area of the system are being removed/replaced or altered. 
  • Product submittal

Access/Egress control system demo:

Required documents listed below:

  • Submit your current low voltage license issued by the state of GA.
  • Floor plan to show what area of the system are being removed/replaced or altered.


 

 

 

 

 

Show All Answers

1. Access/Egress Control System Install/Demo:
2. Area of Refuge System Install/Demo:
3. Click to Enter Install/Demo:
4. Emergency Radio System (BDA) Install/Demo:
5. Fire Alarm System Install/Demo:
6. Fire Sprinkler System Install/Demo:
7. Fire Suppression System Install/Demo:
8. Gas Detection System Install/Demo: