Emergency Radio System (BDA) Install/Demo:

Emergency Radio Systems (BDA) plans shall be per IFC, NFPA 1221, NFPA 70, and NFPA 72, as amended by the State of Georgia with applicable 120-3-3.

Required documents listed below for new installs:

  • Submit your current low voltage license, issued by the state of GA.
  • Submit your current FCC, GROL license, Issued by the Federal Government.
  • Stamped electrical Installation drawings (to include wire diagrams and correct symbols)
  • Product submittal

Required documents listed below for alterations/repairs/modifications of existing systems:

  • Submit your current low voltage license issued by the state of GA.
  • Submit you current FCC license, Issued by the Federal Government.
  • Floor plan to show what area of the system are being removed/replaced or altered. 
  • Product submittal

Emergency Radio System (BDA) Demo:

Required documents listed below:

•             Submit your current low voltage license issued by the state of GA.

•             Submit you current FCC license, Issued by the Federal Government.

•             Floor plan to show what area of the system are being removed/replaced or altered.

Show All Answers

1. Access/Egress Control System Install/Demo:
2. Area of Refuge System Install/Demo:
3. Click to Enter Install/Demo:
4. Emergency Radio System (BDA) Install/Demo:
5. Fire Alarm System Install/Demo:
6. Fire Sprinkler System Install/Demo:
7. Fire Suppression System Install/Demo:
8. Gas Detection System Install/Demo: