Click to Enter Systems and plans shall be per NFPA 70, and City of Savannah ordinances.
Required documents listed below:
• Submit your current low voltage license issued by the state of GA.
• Detailed installation drawings
• Secondary power
• Product submittal package.
Required documents listed below for alterations/repairs/modifications of existing systems:
• Submit your current low voltage license issued by the state of GA.
• Detailed plan to show what is being removed/replaced or altered.
• Product submittal
Click to enter Demo:
Required documents listed below:
• Submit your current low voltage license issued by the state of GA.
• Plan to show what area of the system are being removed/replaced or altered.